Introduction
In Pakistan’s demanding construction landscape from the saline air of Karachi to the expansive infrastructure projects in Lahore and Islamabad water infiltration remains a primary adversary. Construction joints, the inevitable seams in concrete structures, are perpetual weak points for leaks, leading to structural deterioration, mold growth and costly repairs. Traditional sealants and rigid waterstops often fail under hydrostatic pressure and concrete movement.
Enter AQUAFIN®-CJ6, an advanced thermoplastic swell able water stop Bar engineered to provide an intelligent, self sealing barrier. More than just a waterproofing Bar, it represents a proactive roof leakage solution and a cornerstone for reliable concrete waterproofing across Pakistan.

Key Features & Superior Advantages
· High Pressure Resistance: Provides a watertight seal against up to 4 bar of hydrostatic pressure, making it ideal for basements, water tanks and underground structures common in Pakistani construction.
· Rapid & Powerful Swelling: Activation begins within 2 hours, achieving 50% swell. It reaches ~460% in 24 hours and a maximum of ≥700% in 8 days, ensuring a fast and reliable seal.
· Self Injecting Effect: The swelling action actively drives the material into micro cracks and cavities adjacent to the joint, creating a superior waterproof coating from within.
· Dimensional Stability: Remains effective and stable even at high temperatures, a critical feature for roof waterproofing in Pakistan’s intense summer heat.
· Simple & Versatile Application: Can be installed by bonding with adhesive or mechanical fixing with nails, accommodating various on site conditions faced by waterproofing companies in Pakistan.
Typical Applications in the Pakistani Context
AQUAFIN®-CJ6 is versatile for numerous waterproofing services in Pakistan:
· Basement Walls & Foundations: Primary defense against groundwater ingress.
· Water & Sewage Treatment Tanks: Permanent sealing of construction joints.
· Swimming Pools & Reservoirs: Safe for potable water contact.
· Bridge Abutments & Expansion Joints: Resists vibration and movement.
· Roof & Terrace Construction Joints: A critical component for a complete roof seepage solution.
· Industrial Floors & Parking Decks: Protects against water and chemical exposure.
Step-by-Step Application Guide for Best Results
1. Surface Preparation: The substrate (concrete) must be even, clean and free of oil, dust, or laitance. It can be slightly damp but not waterlogged.
2. Installation:
· Bonding Method: Fix the Bar using a recommended mounting adhesive for swellable waterstops. Concreting can proceed after 8 hours.
· Mechanical Fixing: Alternatively, secure using stainless steel nails (min. 5 nails per meter), ensuring full contact with the substrate.
3. Joint Connections:
· Lap Joints: Overlap Bar ends by a minimum of 5 cm.
· Butt Joints: Join ends squarely and cover with a separate Bar strip, overlapping by at least 3 cm on each side.
4. Concreting: A minimum concrete cover of 8 cm on the water-exposed side is mandatory to protect the Bar and ensure proper function.
5. Important Note: Protect the installed Bar from pre swelling (rain, splashing) before concreting and guard against displacement during the pour.
Why AQUAFIN®-CJ6 is the Best Choice for Pakistan
For engineers, contractors and waterproofing companies in Pakistan, specifying AQUAFIN®-CJ6 offers undeniable benefits:
· Proven Performance: BBA certification and tested data provide confidence for critical projects in Karachi, Lahore and Islamabad.
· Cost Effective Longevity: Prevents expensive post construction leak repair, offering a true high performance roof protection solution.
· Adapts to Local Challenges: Effective against saline conditions in coastal Karachi and high groundwater tables in various Punjab sites.
· Complements Other Systems: Works seamlessly as part of a comprehensive waterproofing system in Pakistan, including cementitious waterproofing and liquid applied membranes.
Frequently Asked Questions (FAQs)
Q: Is AQUAFIN-CJ6 suitable for retrofitting existing leaking joints?
Yes, it can be applied to existing joints if the substrate is properly prepared cleaned, sound and accessible making it a viable roof leak proofing solution for repair projects.
Q: How does it compare to bentonite or PVC water stops?
Unlike passive PVC strips, CJ6 actively swells to seal leaks. Compared to bentonite, it offers more controlled swelling, higher pressure resistance and better dimensional stability.
Q: What is the shelf life and storage advice?
It has a shelf life of 24 months when stored cool, dry and protected from sunlight in its original packaging.
Q: Can it be used for roof waterproofing service projects directly on terrace slabs?
Absolutely. It is specifically designed to seal construction joints in concrete roof slabs, preventing a common source of roof leakage.
Conclusion
AQUAFIN®-CJ6 is not merely a product; it is a performance engineered waterproofing compound that turns construction joints from a vulnerability into a strength. Its intelligent swelling technology offers a reliable, long term answer to Pakistan’s pervasive waterproofing challenges.
For your next project whether a new build requiring robust concrete waterproofing or a repair project needing a definitive roof seepage solution choosing AQUAFIN®-CJ6 is a decision for permanent integrity.
Call to Action
Ready to eliminate joint leaks for good? Contact Aquafin Pakistan today to request a sample, get a project specific quotation, or consult with our technical experts on integrating AQUAFIN®-CJ6 into your waterproofing system.

0 Comments